Tag Archives: tillage

Second Pass & Broadcast

With the first pass May 15, 16, and 17 behind me, several very light rain showers, and a few days of drying out, I was ready to get to that second tillage pass and get the annual seeds in the dirt!.  Thursday,  May 25, 2017, I spent 4 hours with the Howard Rotavator 600 and was pleasantly surprised that, for the most part, the John Deere 4250 tractor worked along nicely at A2 speed vs A1.  This effectively increased my speed from 2.1 mph to 2.6 mph.  And it showed up in the final tally for sure!  The second pass on the same 18 acres, instead of taking 12 hours as before, only rang up 7 1/2 hours.  Nice.  Admittedly, i could never make a farmer (row cropper); how do those guys run those things for hours on end, daylight to dark, day after day.  I was thankful, i could distract myself for a while, at least on the long rows, by chatting (private message) with my son, who was at a cafe in Spain, and texting about soil conditions with a friend who was farming another part of my farm with 120 acres for organic soybean production.  I finished up with the second pass on the 26th.  It was also seeded on the 26th.

When i was about 2/3 rds completed, Allen came with a huge bag of premixed annual seed to fill the hopper on the Einboch power seeder and harrow.  He finished all 18 acres in about 4 hours, counting a couple stoppages due to hoses plugging.

So, time spent so far:

Mixing seeds – 1 hour

Tractor – first pass – 12 hours

Tractor – second pass – 7 1/2 hours

Tractor/Seeding  – 4 hours

A couple of ways to figure the cost of establishment.

One is to figure my actual costs and assign an hourly rate for our time plus wear/tear/depreciation on the tractor and implements.  And the other is to use custom rental rates which are figured by the acre.

  1. Total man hours spent – 24.5 hours at $??/hr
  2. Tractor costs for 23.5 hours at $??/hr
  3. Seed cost
  4. Fuel costs – 23.5 times 7.7 gph = 181 gallons @

Or using machinery rental rates (which is what i’m going to do since i don’t know the above costs!)

  1. tractor and rotavator – 36 acres times $20/acre = $720.00
  2. tractor and seeder/harrow – 18 acres times $15/acre = $270.00
  3. Seed costs – $31.56 per acre is what i ordered – HOWEVER, i am informed that Allen actually put on about half again as much, so i will multiply that amount by 1.5 for a per acre cost of $47.34.  The additional seed will hopefully pay off in increased forage yields.  So total seed costs are $$852.12.

Buckwheat 6# @ $ .90/lb

Lespedeza 6# @ $1.00/lb

Pearl Millet 5# @ $1.05/lb

Oats 12# @ $ .28/lb

Cowpeas 6# @ $ .90/lb

Sunflower 5# @ $.45/lb

Red Clover  2# @ $1.95/lb

Total expenses then amount to $1842.12 or $102.34 per acre.  That’s a lot and does not include the 2 tons of lime i had applied in April at a cost of $66/acre.  It’s tough to say this all has to be recouped in one year or one grazing because the lime will be there for the rest of my life and the tillage will have long term effects in loosening the soil as well as eradicating the toxic endophyte infected fescue.  With so many variables, counting the cost, or rather, measuring the increase or lack thereof, in the short run, is very difficult in ranch renovation.

image
Greased up and ready to go!
image
Greased up and ready to go!
image
On the long rows, i can distract myself by chatting through Facebook with my son, who was in Spain, and texting my friend who is farming another portion of my land about soil conditions.  Lot of talk about the negative aspects of multitasking, but we all do it and it works.
image
Seen here the second pass.
image
Wasn’t just a plethora of big rocks this machine dug up.  Boy howdy, this made quite a clatter!  Thankfully, it did not do any damage and i was able to easily unwind this heavy chain from the shaft.
image
Allen, my husband, moving along quickly with the Einbach seeder/harrow.  I gotta keep plugging along or he will overtake me!
image
Einboch PneumaticStar – Pro Grass Seeder/harrow
image
After the Einbock Pneumatic Seeder/Harrow passes.
image
Seeded 26 May, no rain, but took this photo this morning, the 1st of June, and it can already be rowed, but ya gotta hold your head just right to see it.
image
Close up of some of the forages emerging – very exciting!  Only 5 days in the ground.

The plan is to have something to graze in 60-75 days. This will depend large part on moisture.  We are getting pretty dry now already and need a rain.  I will post updates.

image
Here’s a shot of my seed mix in the machine.

By the way, you noticed i’m not including costs associated with photography and blogging.  It’s a good way to force me to sit down and keep a log of expenses, time, and results.  Hopefully, it will help others as well!

Managing soil, water, and animals properly and privately goes a lot further than politically motivated government regulations written by people who are far removed from soil and weather.

Cheers!

tauna

The Big Till

As a first step of my endophyte infected fescue eradication and pasture renovation project, today was the big day of tillage.  My husband had purchased a Howard Rotavator 600, which is 10 foot wide sod-cutting and chewing machine and the soil (actually just dirt, it’s in pathetic condition) it’s been through gave it a real workout.  Even the tractor couldn’t keep up and i had to sidle over and only take 2′-5′ bite of new sod at times, especially going up hill.  This first pass took place on May 17-18, 2017.

IMG_2667
Here my husband has been running the equipment to make sure everything was working.  I’m getting ready for my dual.  Operating new equipment is always an uneasy step for me!
IMG_2669
The ‘soil’ more like dirt because it’s so dead is very compacted and lots of clay making for a lot of overlapping.  I even killed the tractor a couple times because there was simply not enough power to pull the machine.  I quickly learnt how much ‘bite’ the machinery could take so the John Deere 4250 would not be overwhelmed.
IMG_2690
The Howard Rotavator 600.  Here’s a link to a video of the rotavator in operation.
IMG_2679
My soil hasn’t been tilled since at least the early 1960’s.  It’s compacted with little to no life in it.  Just dirt.  The  hope is to allow water and other nutrient infiltration to encourage forage growth.  This is an example of first pass.

IMG_2680

One pass tillage next to existing stand of grass.  Serious clay content.  Methinks some of this worked up harder than if i took down the gravel road!

18447365_10208951224400242_1733792195519459584_n
Plenty of big rocks (these are some of the smaller ones) to make the machine go ‘klunk’!
IMG_2695
My office for a total of 8 hours.  Allen ran it for about 4 hours. 

All in all, i mapped out about 18 acres actually tilled.  There are about 25 acres total in the area being renovated, however, because of the steep slopes, several acres are left alone to serve as grassy waterways.  I wonder, however, as hard as the ground is, if the tilled portions won’t actually hold and stop more water than the hard pan waterways.  Hmmm.

So far, 12 hours spent (1.5 acres per hour) tilling, but not counting time servicing tractor and machine or time spent getting to/from the farm.  Tractor uses about 7.7 gallons diesel fuel per hour, so 92.5 gallons there.  Second pass should take a bit less time, but we’ll see!

We received a big storm last night with about an inch of rain, so the second pass won’t happen for a few days – depending on weather.  Allen will be right behind the second rotatiller pass with the Einbach harrow/seeder and my selected annual grass mix.

Per acre healing forages:

  1.  6 lbs buckwheat
  2.  6 lbs lespedeza
  3.  3 lbs pearl millet
  4. 12 lbs oats
  5.  6 lbs cowpeas
  6.  5 lbs sunflower
  7.  2 lbs red clover

These were chosen for their prolification, adaptability to poor soils, nitrogen fixing, and low cost as well as providing excellent grazing in 60-75 days.

IMG_2706
Grass waterways left to slow water during rains until the rest has forage established.
IMG_2701
Not a clear photograph, but a better idea of leaving waterways.
IMG_2704
On the far slope, the rows would have been so short that a lot of time would have been spent just turning around, so i chose to strip till through and across low and high spots.  Time will tell if that was the right decision.
IMG_2698
View from my office. 😉